3 meters long is 3 meters long



[ad_1]

This is how you get and get the same amount of fuel you need in the industry to extend the meter. The site is located on the Budapest-Vc line and on the intermodal curve.

The investor BKK Zrt. He enacted the metric extension M3 to plan a collapse. The winner was FMTERV Zrt. In Budapest and VIKTI Ltd. of Kecskemét, whose task was to carry out the project and approve the plan for the implementation of the Hungarian Plan.The original garbage purchase is 3 million forints.

The town line will now be extended to the Kispest Bridge, which is now under the full moon, and will be extended to Kostol. And so:

  • 4.9 kilometers of metric tons;
  • be able to do it and do it;
  • In addition, a maintenance and shutdown facility is available.

In the project, the vast Rcospalota located on the slope of the Vali are also one meter away. To this end, plotting occurs by a P + R parking and a Villamosply correction.

In the east, the Megyeri is extended, because the 3 meters of Megyeri will be in Kls Szilgyi in the district of Jgpalota.

Fot: Polyk Attila – Origo

Here is an intermodal package that connects the 14, 3 meter trams, vans and local buses.
To do this more

  • the trams and trams will be dismantled;
  • kiptik a metr vgllomst;
  • a bus driver j;
  • a junkyard (since now Rkospalota-jpest and Dunakeszi do not have the train);
  • and parking lots P + R, B + R.

The site includes the Megyeri t kln level below the Budapest-Vc line. This takes traffic to the vast site where Dunakeszi can not drive.

[ad_2]

Source link