[ad_1]
O Merval benchmark of the Buenos Aires Stock Exchange rose 3.1% to 33,918 points, after yielding 0.4% on Tuesday for profit.
Simultaneously, the country risk, measured by JP Morgan, reached the area of 706 basis points, a daily drop of 21 units and far from the 840 points that rose in December.
[ad_2]
Source link